1. Goals
    1. Final Goals (What is the ultimate goal of this project) 1-2 sentences

      1. The ultimate goal of GemSTON is to demonstrate the utility of Staked TON by creating tools and technologies that make it easy for developers to integrate Staked TON with assets like tokens, NFTs, and Real-World Assets (RWAs), enabling innovative applications and expanding the Tokamak ecosystem.

      2. Milestone

        1. Articles Launched
          1. GemSTON: A Comprehensive Overview (Link)
          2. GemSTON: Economic System — Market Model (Link)
          3. GemSTON: Economic System — Mining Model (Link)
          4. GemSTON: Economic System — Forging Model (Link)
          5. GemSTON Storyline: draft (Link)
        2. Community Call Recap Published
          1. Set up the community call. (Call recording)
          2. Community Feedback Collected via Q&A (Link)
        3. Economy model finalized
          1. Final Economic Model Overview (Link)
        4. Smart Contracts Code Reviewed and Bug Fixed
          1. The code review was conducted by Project FBI. All reported bugs have been fixed, and the rewards for the code reviewers have been finalized.
          2. GitHub: Closed issues and fixes (Link)
        5. Front-End integration with smart contract and testing
          1. Finished the frontend development and integration for the MVP.
          2. Bug Reported and Fixes: (Link)
        6. GemSTON MVP Launched
          1. Titan Sepolia Deployment: MVP released for internal testing. (Link)
          2. Thanos Sepolia Deployment: MVP released for internal testing. *(Link)*
      3. Easy to understand explanation even outside of team and typical community participant (non-technical persons): The importance of each milestone deliverable, considering the Tokamak Foundation's strategy and the current Tokamak ecosystem

        • Our team is focused on building tools specifically for Layer 2 developers, such as Blockchain developers, NFT creators, DeFi developers, and Smart Contract developers. We aim to empower them by enabling the use of Staked TON (WSTON), adding real value to their digital assets like ERC721 and ERC1155, and unlocking greater opportunities for innovation in the blockchain space.
        • We are particularly targeting EVM-compatible Layer 2 developers. These developers build decentralized applications (dApps) on Layer 2 blockchains like Optimistic Rollups and Zero-Knowledge rollups. Our goal is to provide them with custom scripts and developer tools that simplify the integration of WSTON into their assets, allowing them to take advantage of its high-yield (up to 30% APY) and stable value.
        • In Q1 2025, we’ll release tools for developers to easily add WSTON-backed value to NFTs or digital assets on Layer 2 networks. These tools will help check if assets are eligible to use WSTON, and if not, developers can create new WSTON-backed assets with features like deposits and withdrawals. Our goal is to make it simple for developers to bring real value and stability to their assets.
        • In Q2 2025, we’ll take this further by introducing tools that allow developers to attach multiple staked tokens (such as WSTON, Staked USDT, or rETH) to their NFTs, helping them create stable, risk-mitigated assets. This flexibility will benefit various use cases, including NFT marketplaces, lending protocols, real-world asset tokenization, and DeFi applications.
        • These tools will help developers build powerful applications and ecosystems on the Tokamak network, all while driving growth and increasing the Total Value Locked (TVL) of TON on Tokamak network’s platforms.
      4. Timeline

      Date Milestone Description
      16 October 2024 Articles Published Released a series of articles detailing GemSTON’s economic systems: forging, mining, and market models.
      28 October 2024 Community Call Conducted Hosted Community Call #1 to discuss economic systems and showcase initial MVP features.
      First Week of November Economic Model Finalized Finalized GemSTON’s economic model based on community feedback and internal discussions.
      11 November 2024 Smart Contract Review Completed Conducted final review with Project FBI, resolved bugs, and finalized smart contract rewards.
      2 December 2024 Front-End Integration & Internal Testing Done Integrated smart contracts with the front end, fixed bugs, and completed internal testing.
      3 December 2024 Titan Sepolia Launch Deployed GemSTON MVP with minimum features on Titan Sepolia for community testing.
      9 December 2024 Thanos Sepolia Launch Launched GemSTON MVP on Thanos Sepolia for internal testing.
      Q1 2025 Launch Developer Tools for WSTON Integration Build and release tools to allow developers to attach Staked TON (WSTON) value to assets (ERC721, ERC1155) on any EVM-compatible Layer 2 with smart contract support.
      Q1 2025 L2 Compatibility Scripts Release custom scripts for developers to deploy WSTON-backed assets by bridging TON from Layer 1 to Layer 2, supporting Layer 2 smart contract deployment.
      Q1 2025 Asset Eligibility Checker & Auto Suggestion Provide tools for scanning asset contracts to check eligibility for attaching WSTON-backed value and auto-suggest the integration process.
      Q1 2025 Minting New WSTON-Backed Assets Add functionality to mint new assets backed by WSTON, with default functions like attaching/detaching value, withdrawals, and deposits.
      Q2 2025 Support Multi-Staked Token Strategies Enable developers to attach multiple staked tokens (e.g., WSTON, Staked USDT, rETH) to a single asset, facilitating risk mitigation and stability.
      Q2 2025 Multi-Staked Token Integration for Asset Creation Provide developers with tools to integrate and manage multi-staked tokens on NFTs to ensure stability and diversified risk profiles for assets.
      Q2 2025 Support Applications for Web3 Ecosystem Products Enable developers to build applications such as NFT marketplaces, lending protocols, and real-world asset markets using multi-staked token-backed assets.
      Q2 2025 Supporting DeFi Integration with WSTON-backed Assets Support DeFi applications that use WSTON-backed NFTs and tokens for lending, swapping, and liquidity applications within the broader ecosystem.

      Summary

      In Q4 2024, the team successfully met all planned goals, delivering critical components for GemSTON, engaging the community, and completing internal and external testing to set up the project for broader implementation in the next phase. These achievements build the foundation for further growth and the roadmap’s execution in 2025.


  1. This quarter outputs
    1. Easy to understand explanation even outside of team and typical community participant (non-technical persons): How did your team contribute to achieving the milestone this quarter?

      • Our team contributed to achieving this quarter’s milestone in various key areas:

        1. UI/UX: The team worked on designing and refining the game’s user interface to make it user-friendly, such as creating pages for the market, mining, forging, and more. They also ensured the design matched the game’s functionality, offering a smooth and enjoyable experience for users.
        2. Project Leadership: The leadership focused on aligning the team, coordinating efforts, and ensuring that all milestones were completed on schedule. They organized community calls and made sure everyone was engaged and informed throughout the process.
        3. Smart Contracts: We updated and tested the smart contracts, ensuring they worked correctly with the game’s economy. This included making sure that in-game actions like mining and forging were accurately recorded and executed through blockchain technology.
        4. Frontend Development: Our developers worked on the game’s frontend, making sure the website and features were properly displayed and responsive. They also ensured that the game was accessible on the Thanos Sepolia testnet, allowing for real user testing.
        5. Storyline: The storyline team created and finalized the game’s narrative, which drives player engagement. They designed the game’s world and character images via AI generator to provide players with an immersive experience.

        Together, these contributions helped achieve our Q4 milestones and prepared us for the upcoming community testing and future game features.

    2. Deliverables for Q4

      1. Published articles about GemSTON game mechanics and economic model.
      2. Organized a community call and gathered feedback.
      3. Completed internal testing of GemSTON.
      4. Published an article on GemSTON gameplay.
      5. Launched GemSTON on Titan and Thanos Sepolia.
      6. Completed Chapters 1 to 3 of the GemSTON storyline.

  1. Resources
    1. Figma: Design Link
    2. Code Review Request Form: Notion Link
    3. Planning of Community Call: Notion Link
    4. Roadmap of Q4 2024 - Q4 2025: Notion Link
    5. MVP Economy Model: Notion Link
    6. Plan for MVP Automated Testing: Notion Link
  2. Product
    1. MVP Link on Titan Sepolia
    2. MVP Link on Thanos Sepolia
    3. GemSTON: A Comprehensive Overview
    4. GemSTON: Economic System — Market Model
    5. GemSTON: Economic System — Mining Model
    6. GemSTON: Economic System — Forging Model
    7. GemSTON Community Call #1 Recap
  3. Function
  4. Policy
  5. Knowledge

c. The reason why of each under

  1. Change in the next quarter's deliverables, if any (in a list with an explanation)
  2. Budget request
  3. Change in the road map